EZ STREET cold asphalt saves our customers many thousands of dollars by eliminating much of the operational and functional costs of laying asphalt and repairing roads. Traditionally, hot asphalt has been the only form of asphalting recognised as permanent. As hot asphalt requires expensive machinery and time expensive trips to and from the asphalt plant not to mention plant closures and access difficulties, this is not always available. Where hot asphalt isn't available, cold asphalt is stored and used as a temporary pavement repair. Standard cold asphalt has it's own disadvantages in that it has a very short shelf life, doesn't stay in the hole, requires a tack coat, bleeds and effects the integrity of the surrounding pavement.
By using EZ STREET cold asphalt, our customers can eliminate the process of applying temporary cold asphalt patches only to then re-visit the patch and reinstate with a permanent hot asphalt. The doubling up of material, machinery, labor, waste, and opportunity cost add's up to be far more costly than a one stop EZ Street solution.
Not only does the one stop method work out far cheaper, it also means that the overall output of your team is dramatically enhanced.
Consider the team who applies temporary cold asphalt then re-visits and reinstates with hot asphalt. Two visits for the one permanent result. Now consider the team using EZ STREET cold asphalt. One visit for the 1 permanent result. Instead of revisiting the same pothole, the EZ STREET team is off repairing a new pothole where the standard cold asphalt team is repairing the same pothole.
Finally a financially viable solution to maintaining your roads. |